Large-load and data center interconnection

Large loads such as data centers enter the grid through load interconnection requests, and the public pages treat them unevenly. NYISO reports large-load requests in its Gold Book with summer and winter MW in separate columns. TNEI manages data-center requests from 10 MW to 500 MW and above, Nira models generation and load development, and GridCARE says it has qualified 5 GW across the US.

12 listingsChecked

Clean Power ResearchSoftwarePowerClerkLarge generators and large loads—No-code SaaS—2026-11-11
Electric Power Engineers (EPE)Study and advisoryGrid Analysis & Interconnection—ERCOT and Eastern Interconnect, including SPP, MISO, PJM, ISO-NE, NYISO and SERC (2025 service-team description)——2026-11-11
EnerzinxStudy and advisory—Renewables, data centers and utility-scale energy———2026-11-11
GridCAREStudy and advisoryGridCARE Energize————2026-11-11
GridTrackerQueue data and analytics——US interconnection queuesBrowser interface and MCP connector—2026-11-11
ICFStudy and advisory—Generation and load connections———2026-11-11
New York Independent System Operator (NYISO)Public queue operator—Large-load interconnection requests are reported in the Gold Book———2026-11-11
Nira EnergyQueue data and analytics—Generation and load development———2026-11-11
PacesStudy and advisoryDevelopment-as-a-Service——Services tracked within Paces platform—2026-11-11
Pterra ConsultingStudy and advisorydqBOT IBR model-validation automationDER evaluation and load interconnection engineering———2026-11-11
Smarter Grid SolutionsSoftwareFlexible Grid Interconnections powered by Strata GridDistributed generation, energy storage and large loads—Controls do not depend on a network model—2026-11-11
TNEIStudy and advisory——US data-center interconnection services—Data centers from 10 MW to 500 MW and above2026-11-11

Where large-load requests show up

How rows are read

Published load readings

The queue tracker separates requested MW, conditional study classifications and signed contracts. Each reading names its population and date:

Operators

NYISO’s 2024 Gold Book lists queue position, owner or operator, project and zone for large loads; it is historical reporting, not a current wait estimate. IESO, AESO and BPA also list load connections beside generation; the other operator pages in this table describe generation and storage queues.

Software

PowerClerk handles large generators and large loads in one workflow. Smarter Grid Solutions connects distributed generation, storage and large loads within network limits.

Advisory and capacity discovery

Enerzinx covers renewables, data centers and utility-scale energy. ICF supports generation and load connections, and Pterra does load interconnection engineering. GridCARE Power Finder identifies latent grid capacity and its Energize product supports flexible loads.