Interconnection queue data providers and datasets

Public queues are 18 separate pages; these providers put them in one dataset. Berkeley Lab’s Queued Up is free under CC BY 4.0 and covers 7 ISOs and RTOs plus 50 non-ISO utilities through the end of 2025. GridTracker snapshots queues daily with history since April 2024, and Enverus tracks all 7 US ISOs daily. Grid Status ships an open-source Python library under BSD-3-Clause.

9 listingsChecked

EnverusInterconnectAll 7 US ISOsPOI, output, status and changes over timeDaily public-queue tracking——2026-11-11
Grid Status—Integrations for CAISO, ERCOT, PJM, MISO, SPP, NYISO, ISO-NE, IESO and AESO; dataset coverage varies——Open-source Python library and hosted REST APIOpen-source library: BSD-3-Clause2026-11-11
GridTracker—US interconnection queuesCapacity, status, developer, POI and queue dateDaily snapshots, with history since April 2024Browser interface and MCP connector—2026-11-11
LandGateOfftake Report—Queue date, capacity, POI, generation/storage type and status—Reports and MCP server—2026-11-11
Lawrence Berkeley National LaboratoryQueued Up: 2026 Edition7 ISOs/RTOs and 50 non-ISO utilities———CC BY 4.0; attribution to LBNL and GridTracker2026-11-11
Nira Energy——————2026-11-11
S&P Global Market Intelligence2026 US Interconnection Queues Analysis report2023 analysis covers all 7 US ISOs and 14 major non-ISO utilities; historical report scope————2026-11-11
Wood MackenzieLens Power & Renewables queue dataUS interconnection queuesProject status, technology and queue position———2026-11-11
Yes EnergyInfrastructure InsightsNorth AmericaOfficial ISO queue status———2026-11-11

Choosing a queue dataset

How rows are read

Free and open

Queued Up is the reference for history: attribution to LBNL and GridTracker, data through the end of 2025, Excel updated in May 2026. Grid Status offers a hosted REST API and extracts queues from CAISO, ERCOT, PJM, MISO, SPP, NYISO, ISO-NE, IESO and AESO integrations; its own page notes that dataset coverage varies by operator.

Daily tracking and analytics

Enverus (which owns Pearl Street Technologies) follows POI, output, status and changes over time. Yes Energy scores project completion probability from 0% to 100%. LandGate pairs queue competition with a network upgrade cost curve in millions of dollars against MW. Nira Energy models more than 700 GW and says over 100 developers use it.

Research reports

Wood Mackenzie publishes US queue dashboards with processing times across markets, and S&P Global measures the span from queue entry to proposed online date. S&P’s 2023 analysis covers all 7 US ISOs and 14 major non-ISO utilities; its 2026 edition is a separate report.