Salt River Project: Transition cluster requests

7,200 MW

From SRP: Large Customer Integration Process presentation filed at Arizona Corporation Commission · PDF page 15: cluster results; total new load for 24 customers

Large load · observation 2025-10. Inaugural transition cluster load impact study; results issued October 2025. April 2026 presentation describes an earlier cluster. Sample is 24 customers; these are not necessarily 24 unique campuses.

Source accessed . Queue readings hub · Operator directory · Large-load hub

Measurement and population

Definitions and derivation
Operator / scope The operator or geographic population named by the source.
Salt River Project 1
Measurement The measured stage, capacity, outcome, duration or dated reform event.
Transition cluster requests 1
Resource / load type Resource component or load population. Wind includes onshore and offshore; storage includes batteries and other storage.
Large load 1
Observation date Snapshot, cohort year or reported event date, retaining source precision. Separate from the source access date.
2025-10 1
Value Numeric measurement; interpret with unit, basis and note. Null for a dated milestone.
7,200 1
Unit MW, projects, percent, months or date. Capacity is not energy or dependable capacity unless explicitly stated.
MW 1
Population and denominator Population, study stage, status filter or outcome denominator for this reading.
Inaugural transition cluster load impact study; results issued October 2025 1
Source locator / calculation Workbook sheet and cells or report section, including explicit conversions and derivations.
PDF page 15: cluster results; total new load for 24 customers 1
Requests / sample Number of projects or requests supporting the measurement where available; resource counts may overlap for hybrids.
24 1
Coverage and qualifications Source limitations, conflicts, missing component MW and distinctions needed to interpret this reading.
April 2026 presentation describes an earlier cluster. Sample is 24 customers; these are not necessarily 24 unique campuses. 1

Dated sources

  1. SRP: Large Customer Integration Process presentation filed at Arizona Corporation Commission accessed 2026-11-11