AEP Ohio: Total contracted load
From AEP Ohio: February 13, 2026 tariff load update · Release paragraphs on contracts and tariff steps
Data centers · observation 2026-02-12. New-tariff plus pre-tariff contracted data-center projects. Retrospective stages and contracts have different populations. Contracted projects are scheduled progressively through 2035; MW are not energized demand.
Source accessed . Queue readings hub · Operator directory · Large-load hub
Measurement and population
Definitions and derivation- Operator / scope The operator or geographic population named by the source.
- AEP Ohio 1
- Measurement The measured stage, capacity, outcome, duration or dated reform event.
- Total contracted load 1
- Resource / load type Resource component or load population. Wind includes onshore and offshore; storage includes batteries and other storage.
- Data centers 1
- Observation date Snapshot, cohort year or reported event date, retaining source precision. Separate from the source access date.
- 2026-02-12 1
- Value Numeric measurement; interpret with unit, basis and note. Null for a dated milestone.
- 17,861 1
- Unit MW, projects, percent, months or date. Capacity is not energy or dependable capacity unless explicitly stated.
- MW 1
- Population and denominator Population, study stage, status filter or outcome denominator for this reading.
- New-tariff plus pre-tariff contracted data-center projects 1
- Source locator / calculation Workbook sheet and cells or report section, including explicit conversions and derivations.
- Release paragraphs on contracts and tariff steps 1
- Coverage and qualifications Source limitations, conflicts, missing component MW and distinctions needed to interpret this reading.
- Retrospective stages and contracts have different populations. Contracted projects are scheduled progressively through 2035; MW are not energized demand. 1
Dated sources
- AEP Ohio: February 13, 2026 tariff load update accessed 2026-11-11