AEP Ohio: Pre-tariff contracted load

12,219 MW

From AEP Ohio: February 13, 2026 tariff load update · Release paragraphs on contracts and tariff steps

Data centers · observation 2026-02-12. Contracts signed before the new tariff. Retrospective stages and contracts have different populations. Contracted projects are scheduled progressively through 2035; MW are not energized demand.

Source accessed . Queue readings hub · Operator directory · Large-load hub

Measurement and population

Definitions and derivation
Operator / scope The operator or geographic population named by the source.
AEP Ohio 1
Measurement The measured stage, capacity, outcome, duration or dated reform event.
Pre-tariff contracted load 1
Resource / load type Resource component or load population. Wind includes onshore and offshore; storage includes batteries and other storage.
Data centers 1
Observation date Snapshot, cohort year or reported event date, retaining source precision. Separate from the source access date.
2026-02-12 1
Value Numeric measurement; interpret with unit, basis and note. Null for a dated milestone.
12,219 1
Unit MW, projects, percent, months or date. Capacity is not energy or dependable capacity unless explicitly stated.
MW 1
Population and denominator Population, study stage, status filter or outcome denominator for this reading.
Contracts signed before the new tariff 1
Source locator / calculation Workbook sheet and cells or report section, including explicit conversions and derivations.
Release paragraphs on contracts and tariff steps 1
Coverage and qualifications Source limitations, conflicts, missing component MW and distinctions needed to interpret this reading.
Retrospective stages and contracts have different populations. Contracted projects are scheduled progressively through 2035; MW are not energized demand. 1

Dated sources

  1. AEP Ohio: February 13, 2026 tariff load update accessed 2026-11-11