PJM: RRI selected energy capacity
From PJM: RRI selection announcement · PDF page 1, total energy row
All resources · observation 2025-05-02. Summer submitted energy MW, not UCAP. Selected projects join Transition Cycle 2; selection does not establish commercial operation.
Source accessed . Queue readings hub · PJM Interconnection listing
Measurement and population
Definitions and derivation- Operator / scope The operator or geographic population named by the source.
- PJM 1
- Measurement The measured stage, capacity, outcome, duration or dated reform event.
- RRI selected energy capacity 1
- Resource / load type Resource component or load population. Wind includes onshore and offshore; storage includes batteries and other storage.
- All resources 1
- Observation date Snapshot, cohort year or reported event date, retaining source precision. Separate from the source access date.
- 2025-05-02 1
- Value Numeric measurement; interpret with unit, basis and note. Null for a dated milestone.
- 11,793 1
- Unit MW, projects, percent, months or date. Capacity is not energy or dependable capacity unless explicitly stated.
- MW 1
- Population and denominator Population, study stage, status filter or outcome denominator for this reading.
- Summer submitted energy MW, not UCAP 1
- Source locator / calculation Workbook sheet and cells or report section, including explicit conversions and derivations.
- PDF page 1, total energy row 1
- Requests / sample Number of projects or requests supporting the measurement where available; resource counts may overlap for hybrids.
- 51 1
- Coverage and qualifications Source limitations, conflicts, missing component MW and distinctions needed to interpret this reading.
- Selected projects join Transition Cycle 2; selection does not establish commercial operation. 1
Dated sources
- PJM: RRI selection announcement accessed 2026-11-11