Southern Company Transmission

Publishes OATT generator interconnection request lists and studies for developers in Southern Companies' transmission system.

Public queues

Verified

Visit Southern Company Transmission Compare with others

Southern Company Transmission queue numbers

Full tracker
ReadingValueAs ofSource
Reported active capacityAll resources · n=14531,407.7 MW2025-12-31LBNL and GridTracker: Queued Up 2026 workbook03. Complete Queue Data: B=active, Q=SOCO; V:X resource types mapped to Z:AB MW; 145 active rows
Active requestsAll resources145 projects2025-12-31LBNL and GridTracker: Queued Up 2026 workbook03. Complete Queue Data: count B=active and Q=SOCO

Facts

Source per value
Type Queue operator, data provider, software or study firm.
Public queue operator 1
Offering The named queue, report, dataset, software product or service, as the source names it.
Active OATT requests in transitional cluster study listing 1
Coverage Geography, operators or years the source says the offering covers.
Not published
Request types Generation, storage, load, transmission or DER request types the source says are covered.
Not published
Delivery and access How the queue or product is delivered: public listing, download, API, SaaS or services.
Not published
Update frequency Refresh cadence as the publisher states it. Not a measured data latency.
Not published
Data as of The as-of or last-updated date shown on the source page when we read it.
Not published
Queue data fields Identifiers, project attributes and filters the queue or product lists.
Facility location, proposed POI, generation type/size and comments 1
Status tracking How request status and study stage are tracked.
Not published
Timing data Dates or durations the source publishes or models. A proposed in-service date is not a guaranteed wait time.
Queue date and requested in-service date 1
Historical wait Median or typical wait published in a named report, with its scope.
Not published
Study turnaround Published turnaround target or vendor claim, with its qualifier kept in the value.
Not published
Study types Engineering analyses or process study types the source describes.
Not published
Capacity analytics Published capacity, hosting or transfer analysis.
Incremental and total net MW 1
Cost analytics Upgrade cost modelling, estimates or cost-reduction advisory.
Not published
Risk analytics Project-risk, completion or congestion analytics.
Not published
Queue analytics Queue management, extraction or scenario capabilities.
Not published
Financial tracking Deposits, upgrade costs and other financial obligations the product tracks.
Not published
Standards and compliance Regulatory frameworks or compliance services the source names. Not a certification.
Not published
Application support Help with preparing or processing interconnection applications.
Not published
Integrations and tools APIs, modelling tools or data exchange the source lists.
Not published
License Data or software licence as published.
Not published
Customers Customer types or a named customer, as published.
Not published
Operations support Real-time monitoring, dispatch or control features.
Not published
Application deadline Next application deadline the operator publishes.
Not published
Application window Next cluster application window the operator publishes.
Not published
Application acknowledgment Published time to acknowledge an application.
Not published
Application review Published time for the completeness review.
Not published
Project size range Project sizes the source says it serves.
Not published
Engagement start When a documented client engagement began, per a published case study.
Not published
Ownership Parent or owner as the source states it.
Not published
Trial Free trial or evaluation version the source describes.
Not published
Application fee $ Application fee the operator publishes.
Not published
Pre-application report fee $ Fee for a pre-application report.
Not published
Milestone security $/MW Security required per MW studied, as the operator publishes it.
Not published
Large generator threshold MW Size above which a request counts as a large generator.
Not published
Modeled capacity, published minimum GW Vendor-stated lower bound of project capacity modeled. Not capacity available for purchase.
Not published
Qualified capacity GW Capacity the vendor says it has qualified.
Not published
Customers, published minimum customers Vendor-published lower bound. Not audited.
Not published
Completed studies, published minimum studies Lower bound of studies completed, as the firm states it.
Not published
Reference projects, published minimum projects Projects in a published case study, lower bound.
Not published
Reference capacity GW Total requested capacity of the projects in the published case study.
Not published
Model size buses Largest network model the software supports, as published.
Not published

Sources

  1. www.oasis.oati.com accessed 2026-11-11