ERCOT

Publishes planned-generation interconnection status reports and transmission interconnection cost reporting for the ERCOT region.

Public queues

Verified

Visit ERCOT Compare with others

ERCOT queue numbers

Full tracker
ReadingValueAs ofSource
Active capacityAll resources408,002.1 MW2025-12-31LBNL and GridTracker: Queued Up 2026 workbook09. Active Cap. Region+Type: D271, D272, D273, D274, D275, D276, D277; GW × 1,000
Median request to CODAll resources · n=7448 months2025LBNL and GridTracker: Queued Up 2026 workbook38. IR to COD - region: F202; sample C202
Completion rateAll resources · n=155324.3 %2025-12-31LBNL and GridTracker: Queued Up 2026 workbook25. Comp. Rate Region: C27 / SUM(B27:E27) × 100
Withdrawal rateAll resources · n=155357.2 %2025-12-31LBNL and GridTracker: Queued Up 2026 workbook25. Comp. Rate Region: D27 / SUM(B27:E27) × 100
Conditional base loadLarge load · n=20466,400 MW2026-09-03ERCOT: September 2026 Batch Zero UpdatePDF pages 1 and 6
Conditional studied loadLarge load · n=158127,900 MW2026-09-03ERCOT: September 2026 Batch Zero UpdatePDF page 1, summary
Conditional studied load (chart)Large load · n=158125,400 MW2026-09-03ERCOT: September 2026 Batch Zero UpdatePDF page 6, chart label
Excluded from Batch ZeroLarge load · n=373302,200 MW2026-09-03ERCOT: September 2026 Batch Zero UpdatePDF page 6, excluded-load note
Load requests (preliminary)Large load458,700 MW2026-05-19ERCOT: comments on NPRR1325 and PGRR145PDF page 7: sum 23.9 + 16.8 + 9.6 + 36.1 + 39.6 + 332.7 GW; ×1,000

Facts

Source per value
Type Queue operator, data provider, software or study firm.
Public queue operator 1
Offering The named queue, report, dataset, software product or service, as the source names it.
Generator Interconnection Status (GIS) report 1
Coverage Geography, operators or years the source says the offering covers.
Not published
Request types Generation, storage, load, transmission or DER request types the source says are covered.
Planned generation in ERCOT region 1
Delivery and access How the queue or product is delivered: public listing, download, API, SaaS or services.
Not published
Update frequency Refresh cadence as the publisher states it. Not a measured data latency.
Monthly GIS reports 1
Data as of The as-of or last-updated date shown on the source page when we read it.
Not published
Queue data fields Identifiers, project attributes and filters the queue or product lists.
Not published
Status tracking How request status and study stage are tracked.
Not published
Timing data Dates or durations the source publishes or models. A proposed in-service date is not a guaranteed wait time.
Not published
Historical wait Median or typical wait published in a named report, with its scope.
Not published
Study turnaround Published turnaround target or vendor claim, with its qualifier kept in the value.
Not published
Study types Engineering analyses or process study types the source describes.
Not published
Capacity analytics Published capacity, hosting or transfer analysis.
Resource capacity trends cover gas, wind, solar and battery storage 1
Cost analytics Upgrade cost modelling, estimates or cost-reduction advisory.
Transmission interconnection costs report series added March 2026 1
Risk analytics Project-risk, completion or congestion analytics.
Not published
Queue analytics Queue management, extraction or scenario capabilities.
Not published
Financial tracking Deposits, upgrade costs and other financial obligations the product tracks.
Not published
Standards and compliance Regulatory frameworks or compliance services the source names. Not a certification.
Not published
Application support Help with preparing or processing interconnection applications.
Not published
Integrations and tools APIs, modelling tools or data exchange the source lists.
Not published
License Data or software licence as published.
Not published
Customers Customer types or a named customer, as published.
Not published
Operations support Real-time monitoring, dispatch or control features.
Not published
Application deadline Next application deadline the operator publishes.
Not published
Application window Next cluster application window the operator publishes.
Not published
Application acknowledgment Published time to acknowledge an application.
Not published
Application review Published time for the completeness review.
Not published
Project size range Project sizes the source says it serves.
Not published
Engagement start When a documented client engagement began, per a published case study.
Not published
Ownership Parent or owner as the source states it.
Not published
Trial Free trial or evaluation version the source describes.
Not published
Application fee $ Application fee the operator publishes.
Not published
Pre-application report fee $ Fee for a pre-application report.
Not published
Milestone security $/MW Security required per MW studied, as the operator publishes it.
Not published
Large generator threshold MW Size above which a request counts as a large generator.
Not published
Modeled capacity, published minimum GW Vendor-stated lower bound of project capacity modeled. Not capacity available for purchase.
Not published
Qualified capacity GW Capacity the vendor says it has qualified.
Not published
Customers, published minimum customers Vendor-published lower bound. Not audited.
Not published
Completed studies, published minimum studies Lower bound of studies completed, as the firm states it.
Not published
Reference projects, published minimum projects Projects in a published case study, lower bound.
Not published
Reference capacity GW Total requested capacity of the projects in the published case study.
Not published
Model size buses Largest network model the software supports, as published.
Not published

Sources

  1. www.ercot.com accessed 2026-11-11